Home Again with Bob Vila
Bölüm Listesi26 Bölüm
1
07 Eylül 1998

In a neighborhood outside of Boston, work begins on an affordable housing unit for a person with disabilities. Included: soil decontamination and foundation excavation.

2
14 Eylül 1998

Asphalt shingles and flashing are added to the roof, and walls are prepped with special blocking for mounting safety handrails. Also: tips on paneling and working with a culturally diverse crew.

3
21 Eylül 1998

A special weather- and fire-resistant siding is installed. Also: finishing the basement work and running electrical wiring.

4
28 Eylül 1998

Insulation work is begun and trenches are dug for the new water service. Also: Boston Mayor Thomas Menino stops by to help install the front door.

5
28 Eylül 1998

Bob Vila talks with experts to understand the difference between adaptability and accessibility when designing homes for disabled people.

6
12 Ekim 1998

The railing system is built and integrated with the front porch columns. Also: a tour of Boston's Roxbury community, making a comeback from urban blight.

7
19 Ekim 1998

Landscaping begins, the modular stair system is anchored, and the front porch ramp is built.

8
26 Ekim 1998

Recessed lighting and a cost-effective tankless water heater are installed. Also: a tour of a lighting manufacturing plant.

9
02 Kasım 1998

Drywall goes up and plumbing begins on a shower stall designed for wheelchair users. Included: a field trip to learn about new trends in community living.

10
09 Kasım 1998

The elevator is put in, and bathroom fixtures are installed along with hardware specially designed for people with disabilities.

11
16 Kasım 1998

The energy-efficient boiler is installed, and Bob Vila heads to Germany for a tour of the plant where the boiler was made.

12
23 Kasım 1998

A specially designed lock set is installed, along with an energy-efficient, side-by-side washer-dryer.

13
30 Kasım 1998

Bob Vila tours the completed unit, paying special attention to the wheelchair-accessible kitchen with energy-efficient appliances.

14
07 Aralık 1998

Conversion of an old fur storage building into a residential loft begins in Boston's Leather District. Included: a walking tour of other well-preserved antique commercial buildings in the neighborhood.

15
14 Aralık 1998

Installation of plumbing and heating begins. Included: a look at the progress of Boston's famous highway project, the 'Big Dig'.

16
21 Aralık 1998

Plastering is begun on the project, while Bob Vila takes a trip to Cambridge to meet a landscape architect who converted an industrial building into a spacious home and office.

17
28 Aralık 1998

A platform is built to raise the kitchen and bedroom above floor level. Included: a visit to a nearby finished loft.

18
04 Ocak 1999

The entryway and foyer are painted, and the plate glass windows are replaced throughout. Work on the bathroom begins with shower tile installation and lavatory plumbing.

19
11 Ocak 1999

Bob Vila addresses the challenge of framing and plastering a 48-foot wall with an almost imperceptible curve. Plus, built-in cabinets are constructed.

20
18 Ocak 1999

The bathroom progresses with the installation of an electrically powered full-body shower tower, a dual-speed pressurized toilet, and a glass lavatory.

21
25 Ocak 1999

Installation of the restaurant-style kitchen is begun, and Bob Vila tours the fabrication shop where the steel materials being used were custom-made.

22
01 Şubat 1999

Bob Vila offers tips on installing precision drywall and plastering in tricky places. Plus, a bookshelf nook is built and stainless steel appliances are installed.

23
08 Şubat 1999

Finishes are installed in the bathroom and elsewhere in the loft, track lighting is put in. Included: a tour of Lightolier's Tech Center to learn about the power of light to change the mood of a space.

24
15 Şubat 1999

Architect Greg Rochlin is on-site to oversee the fabrication of the hallway closet system-- a multicolored design pieced together in Formica laminate. Lighting designer Markus Earley returns with some snazzy fixtures and controls, and the stackable Maytag washer/dryer unit is installed in the closet.

25
22 Şubat 1999

Work on the restaurant-style kitchen continues, as the wire shelving system is built and the stainless steel range hood is installed.

26
01 Mart 1999

A tour of the completed conversion project begins with the building's restored facade and ends with the sixth-floor residential loft.