Home Again with Bob Vila
Bölüm Listesi22 Bölüm
4
24 Eylül 2001

Framing continues, while in the basement installers put in special wiring to make this farmhouse a "connected home". Also: a tour of NASA's Johnson Space Center in Houston, Texas.

5
01 Ekim 2001

Metal roofing installation is underway, and the redwood deck is constructed. Included: trimwork on the porch and lessons in farming.

7
15 Ekim 2001

Painting has begun on the exterior, while custom cabinets are installed in the kitchen. Also: a tour of Crown Point factory in Claremont, NH.

8
22 Ekim 2001

Trim work is completed in the living room and the fireplace is installed. A window and vanity are added to the master bath.

9
29 Ekim 2001

Exterior work continues with construction of a new stone wall. Inside the farmhouse, a staircase is built. Also: a look at the heritage of covered bridges in VT.

10
05 Kasım 2001

Work continues in the garage, while home automation solutions are explored inside the residence.

11
12 Kasım 2001

Bob Vila catches up on progress in the home's kitchen, where new appliances have been installed. In the bathroom, tile is applied.

12
19 Kasım 2001

Landscape work begins; inside, carpet is laid down and a new entertainment center is installed. Special appearance: model and designer Kathy Ireland.

13
26 Kasım 2001

Bob Vila takes a final tour of the completed farmhouse project, paying special attention to the landscaping, home automation features, and interior design.

14
03 Aralık 2001

This ambitious restoration project involves renovating a Victorian home as well as a former dairy barn also on the property.

15
10 Aralık 2001

Bob Vila focuses on the barn, a former dairy storage building that will be converted into an artist's studio and office space.

16
10 Aralık 2001

The front door is relocated to accommodate a new larger entranceway, while the design for the kitchen is determined. Also: a tour of Isaac Royall House.

17
24 Aralık 2001

Rough electrical work is in progress, framing is underway on a new addition, and a new tub and new windows are installed.

18
31 Aralık 2001

The barn's roof system gets a makeover, while the interior gets air conditioning. Shingles are added to the exterior, along with a new gutter system.

19
07 Ocak 2002

A tubular skylight is installed, along with new triangular peak windows. Also, exterior painting gets underway.

20
14 Ocak 2002

Cellulose insulation is installed, and construction of the second-floor balcony begins.

21
21 Ocak 2002

The differences between blue board and drywall are discussed, and special fencing is put in. Also: a tour of the factory where the fencing is made.

22
21 Ocak 2002

Stone pavers are installed in the driveway and deck construction begins. Plaster is applied in the bedrooms, and new barn-style doors are installed in the converted dairy storage building.

23
28 Ocak 2002

An interlocking laminate floor system being installed, along with a glass-block wall in the master bath and glass-block flooring elsewhere. The water filtration system is also established.

24
04 Şubat 2002

Landscaping gets underway on the Victorian restoration project house property.

25
18 Şubat 2002

Cabinets and countertops are installed in the kitchen. In the master bedroom, a custom closet system is designed.

26
25 Şubat 2002

The Victorian house in Medford, MA is complete, and Bob Vila guides a tour of the finished restoration, from the pergolas in the yard to the electronics in the home office.