Home Again with Bob Vila
Bölüm Listesi26 Bölüm
1
06 Eylül 1999

Plans are under way to build a house in one week with a team of Habitat for Humanity volunteers in Yonkers, NY. Included: a tour of Yonkers and of a Habitat community in Phoenix.

2
13 Eylül 1999

The walls go up at the Roxbury project, and Bob Vila tours a manufacturing facility where special structural insulated panels (SIPs) are made. Also: a look at a money-saving system for recapturing heat from drain water.

3
20 Eylül 1999

Roof framing begins and the giant ridge beam is raised. Also: a tour of the Oregon plant where I-joists are made.

4
27 Eylül 1999

Exterior trim work continues, while overlaid plywood is installed on the porch ceiling by a team of volunteers and celebrities. Included: tour of a plywood mill in Washington.

5
04 Ekim 1999

Roofing work continues with the installation of photovoltaic shingles that convert solar energy into electricity. Also: a tour of the Global Solar Plant in Arizona.

6
11 Ekim 1999

A special siding goes up, and drywall with pre-finished corners is installed in record time.

7
18 Ekim 1999

The back porch is built with help from some high school tech students, and the trim gets finishing touches.

8
25 Ekim 1999

Bob Vila explains door installation, while indoor and outdoor painting gets underway at the project house.

9
01 Kasım 1999

An entertainment center, flooring, and loft shelves are installed.

10
08 Kasım 1999

Cabinets and counter tops are installed in the kitchen, and money saving energy efficient appliances are discussed.

11
15 Kasım 1999

Carpet is laid in a bedroom and high efficiency fixtures are installed in the bathroom.

12
22 Kasım 1999

Guest B. Smith applies a colorful wainscot pattern along the wall of the children's bedroom.

13

Bu bölüm için henüz açıklama bulunmuyor.

14
06 Aralık 1999

Bob Vila and crew take on restoring the Virginia governor's Federal style mansion, built in 1813.

15
13 Aralık 1999

Floor restoration is underway with an acrylic injection technique.

16
20 Aralık 1999

Preparations are made to pour a concrete floor in the basement, utilizing an elaborate concrete pump system.

17
27 Aralık 1999

Paint is removed from the masonry garden walls and windows are taken down for restoration.

18
03 Ocak 2000

Framing and trim work are underway in the basement, which is being transformed to include a state-of-the-art kitchen, wine cellar, and laundry.

19
10 Ocak 2000

A dumbwaiter is installed to connect the basement kitchen with the first-floor dining room.

20
17 Ocak 2000

Baseboard is installed on the second floor to accommodate updated HVAC and electrical systems.

21
24 Ocak 2000

Preparations are made in the basement kitchen for state-of-the-art foodservice equipment and appliances.

22
31 Ocak 2000

The mantelpieces are preserved in order to restore historic features to the mansion.

23
07 Şubat 2000

Landscaping, masonry work, and painting are done on the mansion's exterior.

24
14 Şubat 2000

A small kitchen in the governor's private quarters is finished and carpet is put down in the bedrooms.

25
21 Şubat 2000

The mansion gets elaborate interior decor.

26