Home Again with Bob Vila
Список эпизодов
1
07 сентября 1998 г.

In a neighborhood outside of Boston, work begins on an affordable housing unit for a person with disabilities. Included: soil decontamination and foundation excavation.

2
14 сентября 1998 г.

Asphalt shingles and flashing are added to the roof, and walls are prepped with special blocking for mounting safety handrails. Also: tips on paneling and working with a culturally diverse crew.

3
21 сентября 1998 г.

A special weather- and fire-resistant siding is installed. Also: finishing the basement work and running electrical wiring.

4
28 сентября 1998 г.

Insulation work is begun and trenches are dug for the new water service. Also: Boston Mayor Thomas Menino stops by to help install the front door.

5
28 сентября 1998 г.

Bob Vila talks with experts to understand the difference between adaptability and accessibility when designing homes for disabled people.

6
12 октября 1998 г.

The railing system is built and integrated with the front porch columns. Also: a tour of Boston's Roxbury community, making a comeback from urban blight.

7
19 октября 1998 г.

Landscaping begins, the modular stair system is anchored, and the front porch ramp is built.

8
26 октября 1998 г.

Recessed lighting and a cost-effective tankless water heater are installed. Also: a tour of a lighting manufacturing plant.

9
02 ноября 1998 г.

Drywall goes up and plumbing begins on a shower stall designed for wheelchair users. Included: a field trip to learn about new trends in community living.

10
09 ноября 1998 г.

The elevator is put in, and bathroom fixtures are installed along with hardware specially designed for people with disabilities.

11
16 ноября 1998 г.

The energy-efficient boiler is installed, and Bob Vila heads to Germany for a tour of the plant where the boiler was made.

12
23 ноября 1998 г.

A specially designed lock set is installed, along with an energy-efficient, side-by-side washer-dryer.

13
30 ноября 1998 г.

Bob Vila tours the completed unit, paying special attention to the wheelchair-accessible kitchen with energy-efficient appliances.

14
07 декабря 1998 г.

Conversion of an old fur storage building into a residential loft begins in Boston's Leather District. Included: a walking tour of other well-preserved antique commercial buildings in the neighborhood.

15
14 декабря 1998 г.

Installation of plumbing and heating begins. Included: a look at the progress of Boston's famous highway project, the 'Big Dig'.

16
21 декабря 1998 г.

Plastering is begun on the project, while Bob Vila takes a trip to Cambridge to meet a landscape architect who converted an industrial building into a spacious home and office.

17
28 декабря 1998 г.

A platform is built to raise the kitchen and bedroom above floor level. Included: a visit to a nearby finished loft.

18
04 января 1999 г.

The entryway and foyer are painted, and the plate glass windows are replaced throughout. Work on the bathroom begins with shower tile installation and lavatory plumbing.

19
11 января 1999 г.

Bob Vila addresses the challenge of framing and plastering a 48-foot wall with an almost imperceptible curve. Plus, built-in cabinets are constructed.

20
18 января 1999 г.

The bathroom progresses with the installation of an electrically powered full-body shower tower, a dual-speed pressurized toilet, and a glass lavatory.

21
25 января 1999 г.

Installation of the restaurant-style kitchen is begun, and Bob Vila tours the fabrication shop where the steel materials being used were custom-made.

22
01 февраля 1999 г.

Bob Vila offers tips on installing precision drywall and plastering in tricky places. Plus, a bookshelf nook is built and stainless steel appliances are installed.

23
08 февраля 1999 г.

Finishes are installed in the bathroom and elsewhere in the loft, track lighting is put in. Included: a tour of Lightolier's Tech Center to learn about the power of light to change the mood of a space.

24
15 февраля 1999 г.

Architect Greg Rochlin is on-site to oversee the fabrication of the hallway closet system-- a multicolored design pieced together in Formica laminate. Lighting designer Markus Earley returns with some snazzy fixtures and controls, and the stackable Maytag washer/dryer unit is installed in the closet.

25
22 февраля 1999 г.

Work on the restaurant-style kitchen continues, as the wire shelving system is built and the stainless steel range hood is installed.

26
01 марта 1999 г.

A tour of the completed conversion project begins with the building's restored facade and ends with the sixth-floor residential loft.