Home Again with Bob Vila
Список эпизодов
4
24 сентября 2001 г.

Framing continues, while in the basement installers put in special wiring to make this farmhouse a "connected home". Also: a tour of NASA's Johnson Space Center in Houston, Texas.

5
01 октября 2001 г.

Metal roofing installation is underway, and the redwood deck is constructed. Included: trimwork on the porch and lessons in farming.

7
15 октября 2001 г.

Painting has begun on the exterior, while custom cabinets are installed in the kitchen. Also: a tour of Crown Point factory in Claremont, NH.

8
22 октября 2001 г.

Trim work is completed in the living room and the fireplace is installed. A window and vanity are added to the master bath.

9
29 октября 2001 г.

Exterior work continues with construction of a new stone wall. Inside the farmhouse, a staircase is built. Also: a look at the heritage of covered bridges in VT.

10
05 ноября 2001 г.

Work continues in the garage, while home automation solutions are explored inside the residence.

11
12 ноября 2001 г.

Bob Vila catches up on progress in the home's kitchen, where new appliances have been installed. In the bathroom, tile is applied.

12
19 ноября 2001 г.

Landscape work begins; inside, carpet is laid down and a new entertainment center is installed. Special appearance: model and designer Kathy Ireland.

13
26 ноября 2001 г.

Bob Vila takes a final tour of the completed farmhouse project, paying special attention to the landscaping, home automation features, and interior design.

14
03 декабря 2001 г.

This ambitious restoration project involves renovating a Victorian home as well as a former dairy barn also on the property.

15
10 декабря 2001 г.

Bob Vila focuses on the barn, a former dairy storage building that will be converted into an artist's studio and office space.

16
10 декабря 2001 г.

The front door is relocated to accommodate a new larger entranceway, while the design for the kitchen is determined. Also: a tour of Isaac Royall House.

17
24 декабря 2001 г.

Rough electrical work is in progress, framing is underway on a new addition, and a new tub and new windows are installed.

18
31 декабря 2001 г.

The barn's roof system gets a makeover, while the interior gets air conditioning. Shingles are added to the exterior, along with a new gutter system.

19
07 января 2002 г.

A tubular skylight is installed, along with new triangular peak windows. Also, exterior painting gets underway.

20
14 января 2002 г.

Cellulose insulation is installed, and construction of the second-floor balcony begins.

21
21 января 2002 г.

The differences between blue board and drywall are discussed, and special fencing is put in. Also: a tour of the factory where the fencing is made.

22
21 января 2002 г.

Stone pavers are installed in the driveway and deck construction begins. Plaster is applied in the bedrooms, and new barn-style doors are installed in the converted dairy storage building.

23
28 января 2002 г.

An interlocking laminate floor system being installed, along with a glass-block wall in the master bath and glass-block flooring elsewhere. The water filtration system is also established.

24
04 февраля 2002 г.

Landscaping gets underway on the Victorian restoration project house property.

25
18 февраля 2002 г.

Cabinets and countertops are installed in the kitchen. In the master bedroom, a custom closet system is designed.

26
25 февраля 2002 г.

The Victorian house in Medford, MA is complete, and Bob Vila guides a tour of the finished restoration, from the pergolas in the yard to the electronics in the home office.