Fondo para This Old House
Fondo para This Old House
Póster de This Old House
This Old House
Lista de Episodios26 Episodio
1
28 de septiembre de 202327 dk

The crew starts a new project in Lexington, MA, to make a 1960 mid-century modern home accessible for a family with a son who has Duchenne Muscular Dystrophy. The crew meets the homeowners to learn about the disease and the challenges the current setup of the house poses. The project is a race against time, but the crew is determined to get the family back into their home as soon as possible.

2
05 de octubre de 202327 dk

The interior is demoed, and rebuilding has begun. The new design and energy code are explained.

3
12 de octubre de 202327 dk

Accessible features integrated into the design begin at construction. A new mechanical room connects to the old via a block wall tunnel, HVAC ducting is buried underground, and after learning about residential elevators, framing begins for one.

4
19 de octubre de 202327 dk

A lally column stands in the way of the new open floor plan. As a solution, it is removed, and the ridge beam is replaced with a trio of engineered beams. The new landscape is previewed in 3D, and tips are shared for creating an accessible bathroom.

5
26 de octubre de 202327 dk

A zero-threshold entry to the patio is framed. Geothermal energy is explained, and wells are dug.

6
02 de noviembre de 202327 dk

The fully framed front of the house is revealed; work continues on the geothermal system; the connection to the interior is made; blocking is installed in the framing; replacing and rewiring old receptacles.

7
09 de noviembre de 202327 dk

Repairing the original brick; building a DIY ramp; touring a modern accessible home; adding trim to the exterior.

8
16 de noviembre de 202327 dk

A walking tour of the roof reveals its various pitches; installing a built-in gutter system; rough-in begins on the interior; energy-efficient windows are installed.

9
04 de enero de 202427 dk

Work on the house is divided into phases for efficient workflow; the back foundation gets a stucco finish; kitchen cabinet selection; installing siding; the back patio gets proper drainage.

10
11 de enero de 202427 dk

The slab-on-grade foundation is built up; accessible AV solutions are explored; prep begins for a curbless shower; installing an automatic zero threshold door.

11
18 de enero de 202427 dk

Copper bonding is installed before the therapy pool is craned in; tile selections are revealed; the integrated entrance ramp gets snow melt and a final layer of concrete; elevator disconnects are installed.

12
25 de enero de 202427 dk

Building the elevator cab; using leftover flooring to make a modern feature for the kitchen island; exploring AV solutions for accessibility; installing new solar panels.

13
01 de febrero de 202427 dk

Work on the internal geothermal systems begins; installing in-wall lighting to illuminate the entrance ramp; installing an offset p-trap; a visit to a glass-blowing studio; grab bar installation begins.

14
08 de febrero de 202427 dk

Landscape planting begins with screen trees and rose bushes; the children pitch in on a painting project; the homeowners discuss Duchenne muscular dystrophy; a modern staircase is installed in the foyer.

15
15 de febrero de 202427 dk

Geothermal is in; kitchen appliances are installed; the new HERS score is revealed.

16
22 de febrero de 202427 dk

The completed renovation of the 1960 mid-century modern home accommodates a family of five, including a child with Duchenne muscular dystrophy; the crew returns to go through the changes with the family.

17
28 de marzo de 202427 dk

The crew heads to New Jersey for the second project of the season - an 1897 Victorian in the Borough of Glen Ridge that's being renovated for multi-generational living. The homeowners give the crew a tour and explain how the new spaces will be used.

18
04 de abril de 202427 dk

Demo has begun uncovering 150-year-old wine bottles in the walls. A chimney is demolished, and the roof is reframed. The architect shares his inspiration for the project, and the mayor gives a tour of the Borough's gas lamps. Asbestos is abated.

19
11 de abril de 202427 dk

Termite damage has caused major construction changes. New footings are needed in the basement. A historic community garden is toured. A 15-year-old student talks about working on the project. The old sewer line is replaced without trenching.

20
18 de abril de 202427 dk

Installing helical piers for the new porch; prepping new windows for installation; protecting plumbing pipes from cold weather.

21
25 de abril de 202427 dk

The new flangeless windows are installed water and air tight. Preparation begins for in-ceiling speakers. The Empire State Building is visited. Porch decking is installed to minimize waste, and a hybrid plumbing system is chosen for the house.

22
02 de mayo de 202427 dk

Air tightness is taken to the next level with vapor barrier electrical boxes. The homeowner designs a custom lead glass sidelight. Various types of weather-resistant barriers are explored. Drip edge flashing and exterior window trim are installed.

23
09 de mayo de 202427 dk

The new staircase is manufactured in a shop and assembled on-site. The shop is toured. The homeowner installs a new brick walkway. Wood fiber insulation and the new HRV system are explored. The architect talks about the interior trim details

24
16 de mayo de 202427 dk

A blower door test reveals the home's airtightness; a baseboard trim gets a radius detail; discussing the borough's effort to maintain its tree-lined streets; installing a prefab tile niche; prepping interior trim for paint finish.

25
23 de mayo de 202427 dk

Building a custom mudroom bench from reclaimed wood; the primary bathroom gets a custom paint finish; spring landscaping; installing kitchen crown molding above the cabinets and recessed lighting.

26
30 de mayo de 202427 dk

Renovation of the 1887 Victorian is completed; the builder installs the custom lead glass sidelight; the crew gets a tour from the homeowners.