تخطي إلى المحتوى الرئيسي
12. Bölüm
This Old House
S20E12لجميع الأعمار

12. Bölüm

12 ديسمبر 199830دقيقة

حول هذه الحلقة

A busy day on site: the back decking is coming along with a new undermount system. The insulation crew is hard at work inside spraying on foam insulation. Up top, Mark Schaub and his crew prepare to line the chimneys with a concrete lining poured down around bladders in each of the flues, and in the backyard, Dick Washburn shows us a unique dipping tank for stripping one of the house's old mantles of paint. In the relative quiet of the workshop, our master carpenter is fabricating a quartersawn white oak raised-panel piece for the bottom of the stairway. Finally, mason Lenny Belliveau works on the newly arrived pink granite blocks for veneering the foundation at the front of the building.

ضيوف الشرف